List change order line rows
Módulo Finance
GET/change-order-lineschangeOrderLines.list
A line of a change order. Returns a cursor page of change order line rows the caller may see. The default order is `created_at` ascending. Supports sparse fieldsets and the filter grammar.
- Requiere la capacidad finance.change_order.read.
- Alcances de OAuth: finance.
- Paginación por cursor: se aplican limit, cursor, fields, sort y filter.
- Estados de error: 400, 401, 429. Los errores son detalles de problema RFC 9457.
Parámetros de ruta y de consulta
| Campo | Tipo | Obligatorio | Descripción |
|---|---|---|---|
| limit | Limit | No | Page size. Default 50, maximum 200.Restricciones: range 1 to 200 |
| cursor | Cursor | No | Opaque cursor from `next_cursor` of the previous page.Restricciones: length 1 to any |
| fields | Fields | No | Sparse fieldset: a comma-separated list of top-level fields to return. `id` is always returned.Restricciones: pattern ^[a-z_][a-z0-9_]*(,[a-z_][a-z0-9_]*)*$ |
| sort | Sort | No | Sort keys, comma-separated; a leading `-` sorts descending. Without `sort`, the documented default order applies (coded lists sort in numeric code order).Restricciones: pattern ^-?[a-z_][a-z0-9_]*(,-?[a-z_][a-z0-9_]*)*$ |
| filter | Filter | No | Filter grammar `filter[field][op]=value`. Operators: eq, ne, lt, lte, gt, gte, in (comma-separated values), is_null (true or false) and contains. Conditions combine with AND. |
Respuesta 200: una página de ChangeOrderLine
| Campo | Tipo | Obligatorio | Descripción |
|---|---|---|---|
| id | string (uuid) | Sí | Identifier of the change order line. |
| org_id | string (uuid) | Sí | Identifier of the owning organization, derived from the parent row and never accepted from the caller. |
| created_at | string (date-time) | Sí | When the row was created. |
| created_by | string (uuid) | null | Sí | Identifier of the person who created the row; null when a seed, platform or system process created it. |
| updated_at | string (date-time) | Sí | When the row was last updated. |
| updated_by | string (uuid) | null | Sí | Identifier of the person who last updated the row; null when a seed, platform or system process updated it. |
| change_order_id | string (uuid) | Sí | Identifier of the change order. |
| budget_line_id | string (uuid) | null | Sí | Identifier of the affected budget line. |
| urid | UridAtAnyGrain | Sí | URID at discipline grain (`DDDD.DD`) or category grain (`DDDD.DD.DD`), as GL dimension 2 allows.Restricciones: pattern ^[0-9]000(\.[0-9]{2}){1,2}$ |
| description | string | Sí | Line description.Restricciones: length 1 to 300 |
| quantity | number | Sí | Quantity; defaults to 1. |
| unit_price_minor | integer (int64) | null | Sí | Unit price; null when unpriced. Integer minor units of the resource currency; null means unpriced, never zero. |
| is_no_cost | boolean | Sí | Whether the line is deliberately free of charge. |
| account_code | GlAccountCode | null | Sí | |
| cost_center_id | string (uuid) | null | Sí | Identifier of the cost center (dimension 1) of the budget line the change revises. |
{
"data": [
{
"id": "0192f1e2-7c3a-7b4d-9e8f-1a2b3c4d5e6f",
"org_id": "0192f1e2-7c3a-7b4d-9e8f-1a2b3c4d5e6f",
"created_at": "2026-10-08T14:30:00Z",
"created_by": "0192f1e2-7c3a-7b4d-9e8f-1a2b3c4d5e6f",
"updated_at": "2026-10-08T14:30:00Z",
"updated_by": "0192f1e2-7c3a-7b4d-9e8f-1a2b3c4d5e6f",
"change_order_id": "0192f1e2-7c3a-7b4d-9e8f-1a2b3c4d5e6f",
"budget_line_id": "0192f1e2-7c3a-7b4d-9e8f-1a2b3c4d5e6f",
"urid": "4000.01",
"description": "Bar build and dressing",
"quantity": 24,
"unit_price_minor": 1200000,
"is_no_cost": false,
"account_code": "5400",
"cost_center_id": "0192f1e2-7c3a-7b4d-9e8f-1a2b3c4d5e6f"
}
],
"next_cursor": null
}Ejemplos de código
curl -X GET "$XOS_BASE_URL/change-order-lines" \
-H "Authorization: Bearer $XOS_API_KEY"for await (const row of xos.changeOrderLines.listAll()) {
console.log(row);
}for row in xos.change_order_lines.list_all():
print(row)xos change-order-lines list --all