Skip to content

List PO change order rows

Procurement module

GET/po-change-orderspoChangeOrders.list

A change to an issued purchase order. Returns a cursor page of PO change order rows the caller may see. The default order is `created_at` ascending. Supports sparse fieldsets and the filter grammar.

  • Requires the capability procurement.po.read.
  • OAuth scopes: procurement.
  • Cursor-paginated: limit, cursor, fields, sort and filter apply.
  • Error statuses: 400, 401, 429. Errors are RFC 9457 problem details.

Path and query parameters

poChangeOrders.list: Path and query parameters
FieldTypeRequiredDescription
limitLimitNoPage size. Default 50, maximum 200.Constraints: range 1 to 200
cursorCursorNoOpaque cursor from `next_cursor` of the previous page.Constraints: length 1 to any
fieldsFieldsNoSparse fieldset: a comma-separated list of top-level fields to return. `id` is always returned.Constraints: pattern ^[a-z_][a-z0-9_]*(,[a-z_][a-z0-9_]*)*$
sortSortNoSort keys, comma-separated; a leading `-` sorts descending. Without `sort`, the documented default order applies (coded lists sort in numeric code order).Constraints: pattern ^-?[a-z_][a-z0-9_]*(,-?[a-z_][a-z0-9_]*)*$
filterFilterNoFilter grammar `filter[field][op]=value`. Operators: eq, ne, lt, lte, gt, gte, in (comma-separated values), is_null (true or false) and contains. Conditions combine with AND.

Response 200: a page of PoChangeOrder

poChangeOrders.list: PoChangeOrder
FieldTypeRequiredDescription
idstring (uuid)YesIdentifier of the po change order.
org_idstring (uuid)YesIdentifier of the owning organization, derived from the parent row and never accepted from the caller.
created_atstring (date-time)YesWhen the row was created.
created_bystring (uuid) | nullYesIdentifier of the person who created the row; null when a seed, platform or system process created it.
updated_atstring (date-time)YesWhen the row was last updated.
updated_bystring (uuid) | nullYesIdentifier of the person who last updated the row; null when a seed, platform or system process updated it.
purchase_order_idstring (uuid)YesIdentifier of the purchase order.
descriptionstringYesWhat changes.Constraints: length 1 to 20000
amount_delta_minorinteger (int64) | nullYesChange amount; null when unpriced. Integer minor units of the resource currency; null means unpriced, never zero.
po_change_order_state"Proposed" | "Approved" | "Rejected" | "Canceled"YesPO change order state.
{
  "data": [
    {
      "id": "0192f1e2-7c3a-7b4d-9e8f-1a2b3c4d5e6f",
      "org_id": "0192f1e2-7c3a-7b4d-9e8f-1a2b3c4d5e6f",
      "created_at": "2026-10-08T14:30:00Z",
      "created_by": "0192f1e2-7c3a-7b4d-9e8f-1a2b3c4d5e6f",
      "updated_at": "2026-10-08T14:30:00Z",
      "updated_by": "0192f1e2-7c3a-7b4d-9e8f-1a2b3c4d5e6f",
      "purchase_order_id": "0192f1e2-7c3a-7b4d-9e8f-1a2b3c4d5e6f",
      "description": "Add six deck sections.",
      "amount_delta_minor": 27000,
      "po_change_order_state": "Proposed"
    }
  ],
  "next_cursor": null
}

Code samples

curl -X GET "$XOS_BASE_URL/po-change-orders" \
  -H "Authorization: Bearer $XOS_API_KEY"
for await (const row of xos.poChangeOrders.listAll()) {
  console.log(row);
}
for row in xos.po_change_orders.list_all():
    print(row)
xos po-change-orders list --all