Skip to content

Get a change order line

Finance module

GET/change-order-lines/{id}changeOrderLines.get

A line of a change order. Returns one change order line with its `ETag`. A change order line the caller may not see returns 404.

  • Requires the capability finance.change_order.read.
  • OAuth scopes: finance.
  • Error statuses: 400, 401, 404, 429. Errors are RFC 9457 problem details.

Path and query parameters

changeOrderLines.get: Path and query parameters
FieldTypeRequiredDescription
idstring (uuid)YesIdentifier of the change order line.
fieldsFieldsNoSparse fieldset: a comma-separated list of top-level fields to return. `id` is always returned.Constraints: pattern ^[a-z_][a-z0-9_]*(,[a-z_][a-z0-9_]*)*$

Response 200: ChangeOrderLine

changeOrderLines.get: ChangeOrderLine
FieldTypeRequiredDescription
idstring (uuid)YesIdentifier of the change order line.
org_idstring (uuid)YesIdentifier of the owning organization, derived from the parent row and never accepted from the caller.
created_atstring (date-time)YesWhen the row was created.
created_bystring (uuid) | nullYesIdentifier of the person who created the row; null when a seed, platform or system process created it.
updated_atstring (date-time)YesWhen the row was last updated.
updated_bystring (uuid) | nullYesIdentifier of the person who last updated the row; null when a seed, platform or system process updated it.
change_order_idstring (uuid)YesIdentifier of the change order.
budget_line_idstring (uuid) | nullYesIdentifier of the affected budget line.
uridUridAtAnyGrainYesURID at discipline grain (`DDDD.DD`) or category grain (`DDDD.DD.DD`), as GL dimension 2 allows.Constraints: pattern ^[0-9]000(\.[0-9]{2}){1,2}$
descriptionstringYesLine description.Constraints: length 1 to 300
quantitynumberYesQuantity; defaults to 1.
unit_price_minorinteger (int64) | nullYesUnit price; null when unpriced. Integer minor units of the resource currency; null means unpriced, never zero.
is_no_costbooleanYesWhether the line is deliberately free of charge.
account_codeGlAccountCode | nullYes
cost_center_idstring (uuid) | nullYesIdentifier of the cost center (dimension 1) of the budget line the change revises.
{
  "id": "0192f1e2-7c3a-7b4d-9e8f-1a2b3c4d5e6f",
  "org_id": "0192f1e2-7c3a-7b4d-9e8f-1a2b3c4d5e6f",
  "created_at": "2026-10-08T14:30:00Z",
  "created_by": "0192f1e2-7c3a-7b4d-9e8f-1a2b3c4d5e6f",
  "updated_at": "2026-10-08T14:30:00Z",
  "updated_by": "0192f1e2-7c3a-7b4d-9e8f-1a2b3c4d5e6f",
  "change_order_id": "0192f1e2-7c3a-7b4d-9e8f-1a2b3c4d5e6f",
  "budget_line_id": "0192f1e2-7c3a-7b4d-9e8f-1a2b3c4d5e6f",
  "urid": "4000.01",
  "description": "Bar build and dressing",
  "quantity": 24,
  "unit_price_minor": 1200000,
  "is_no_cost": false,
  "account_code": "5400",
  "cost_center_id": "0192f1e2-7c3a-7b4d-9e8f-1a2b3c4d5e6f"
}

Code samples

curl -X GET "$XOS_BASE_URL/change-order-lines/0192f1e2-7c3a-7b4d-9e8f-1a2b3c4d5e6f" \
  -H "Authorization: Bearer $XOS_API_KEY"
const { data, etag } = await xos.changeOrderLines.get("0192f1e2-7c3a-7b4d-9e8f-1a2b3c4d5e6f");
response = xos.change_order_lines.get("0192f1e2-7c3a-7b4d-9e8f-1a2b3c4d5e6f")
xos change-order-lines get 0192f1e2-7c3a-7b4d-9e8f-1a2b3c4d5e6f